Useful performance
Measure the agreed workloads and service expectations.
Mentis8 / Installation
From your first workflow to private infrastructure on your premises. We plan the harness, capacity and site together, with clear costs and operating responsibilities.
From survey to first workflow
We plan the hardware, custom cooling and enterprise harness as one delivery. Your onsite hardware engineer coordinates assembly, specialist connections and commissioning.
Survey
Your workflow owner, IT team and facilities lead define the first workload, data boundaries, delivery route, electrical supply and approved heat outlet.
Site + workload briefEngineer
Size compute and cooling together. Document power distribution, outdoor placement, independent coolant routes, network access and the custom harness scope.
Agreed installation designFactory test
Preassemble the selected modules and label connections. Validate cooling, total power, protective responses and the agreed configuration before release for delivery.
Factory acceptance recordDeliver & assemble
The onsite hardware engineer coordinates delivery and assembly. Position the compute cabinet, indoor thermal modules and outdoor cooling units on the approved route.
Assembled systemConnect
Qualified trades connect the engineered electrical interface. Install each coolant pair and control connection, then connect the private network and approved enterprise sources.
Power + cooling + networkCommission & hand over
Check leaks, temperatures, electrical load and fault response. Run the first workflow, verify access boundaries and hand over operating records, training and service responsibilities.
Site acceptance + first workflowWhat arrives
Qualified electrical capacity, an approved outdoor heat-rejection area, a permitted connection route, suitable floor loading and service access. Existing interfaces can reduce permanent alterations at eligible sites. An ordinary closet or standard wall socket is not a universal fit. Site preparation, approvals and any required building work are established before commitment.
Confirm workload, power, heat rejection, access and service space.
Select the system and document the site interfaces.
Check the configured equipment against an agreed test plan.
Deliver modules and connect through the qualified site interfaces.
Test workload performance, thermal operation and recovery.
Hand over service responsibilities, runbooks and update procedures.
| Site interface | What the review establishes |
|---|---|
| Electrical | Available service, dedicated distribution, protection and the connection route. |
| Heat rejection | Where heat goes continuously, including hot-weather conditions and fault response. |
| Physical access | Delivery route, floor loading, assembly area and service clearances. |
| Network | Service and management connections, access controls and permitted outbound paths. |
| Operations | Named owners, alarm response, maintenance access and recovery procedures. |
A removable, modular installation is the design objective for qualified sites. It is not a claim that every office or storage closet can accept the system without preparation.
Measure the agreed workloads and service expectations.
Verify access boundaries, monitoring and recovery behavior.
Confirm documentation, responsibilities and maintenance access.
Deployment architecture is under qualification. Final equipment, interfaces, installation scope and schedule are established before commercial commitment.